Showroom on Atwood Avenue, Tue to Fri 9 to 5, Sat 10 to 3

Middleton · 2026

A 2003 ranch kitchen refaced in eleven days

Solid plywood boxes and a layout that already worked. The owners wanted the honey-oak look gone before hosting a graduation party, and they had eight weeks.

  • Refacing
  • 11 days on site
  • $19,000 to $24,000
A 2003 ranch kitchen refaced in eleven days, finished kitchen
The brief

What the owners asked for

The kitchen worked. The finish did not. Honey oak raised-panel doors, a laminate top and a 4-inch splash that made the room feel a decade older than the house.

The graduation party date was fixed, which made refacing the only honest option. A full remodel could not have been designed, built and installed in the window available.

Scope of work

  • 34 doors and 12 drawer fronts replaced in paint-grade maple Shaker
  • All visible face frames and cabinet ends wrapped in matching veneer
  • 12 new dovetailed drawer boxes on undermount soft-close slides
  • Quartz countertops templated and set
  • Full-height slab backsplash behind the range
  • Under-cabinet linear LED added on a new dimmer
Before and after

Drag to see what changed

The before photo is the room as we found it on survey day. The after photo is the handover shoot.

More case studies
A 2003 ranch kitchen refaced in eleven days, after the remodel
A 2003 ranch kitchen refaced in eleven days, before the remodel
Layout change
No layout change. New doors, new drawer boxes, new counters and a full-height splash behind the range.
Timeline
11 days on site
Budget band
$19,000 to $24,000 (sample range)
House
2003 ranch
See all six case studies
Specification

What it is made of

Doors
Paint-grade maple Shaker, Linen White
Countertops
Engineered quartz, soft grey vein
Backsplash
Quartz slab to the underside of the uppers
Hardware
Matte black bar pulls, 5-inch centers
Lighting
2700K linear LED under cabinet
Browse the materials library
What went wrong

A sink base that had quietly failed

Under the sink, the cabinet bottom had been wet long enough to delaminate. We built and finished a replacement sink base at the shop to match the existing run, swapped it during install, and the owners never saw a schedule change.

What changed for the owners

  • Eleven days on site, finished nine days before the party
  • Roughly 38 percent of the quoted cost of full replacement
  • Original boxes stayed out of the landfill
  • Every drawer now opens fully and closes softly

Eleven days. Our kitchen was usable every evening but two. I still cannot believe these are the same cabinets.

Desmond FowlerMiddleton, cabinet refacing
Next step

Bring a photo of your kitchen. Leave with a real number.

Ninety minutes, no charge, no obligation. Door samples go home with you the same day.

Showroom on Atwood Avenue, Tue to Fri 9 to 5 and Sat 10 to 3.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.